Stage of completion
» Load bearing structure of the building – of reinforced concrete, solid, beamless with columns and discs as vertical carrying elements. The reinforced concrete framework provides spatial stability of the structure in regards to seismic impact
» Internal staircases – reinforced concrete console flight of stairs. The walls of the staircase cell to the flats are insulated with 5 cm thick EPS
» Roof – a slab of reinforced concrete
» External surrounding walls – 25 cm thick brick masonry, non-load bearing, made of hollow bricks with EPS heat insulation of 5 cm
» Internal surrounding walls between the separate apartments – 25 cm thick brick masonry
» Internal walls in the flats – 12 cm gypsum-plaster walls
» Hydro insulation – hydro insulation of the foundations and below the concrete layer
» Heat insulation – EPS
» Heat insulation – 8 cm XPS
» Vapour barrier and hydro insulation
» Covering – blinding
» Heat insulation – 5 cm EPS on external walls, 8 cm XPS on terraces above heated premises, 5 cm XPS under the slab of the first housing floor and below the bay windows
» Materials for finishing the facades – aluminium millwork, clinker facing, mineral plaster
» Aluminium rails of the terraces with glass
- Architectural finishing works:
» External profiles – doors and windows – PVC profile and glazing
» Internal woodwork – veneered MDF
» Flooring:
- Entrance hall – tiles
- Living room, bedrooms and kitchenette – tiles
- Bathrooms and toilets –tiles
- Terraces – tiles
- Internal staircases and landings – polymer concrete steps and terracotta tiles
» Internal walls – plaster, stucco puttying and latex
» Ceilings – plaster, stucco puttying and latex
» Kitchen – furniture according to a standard design, including:
- a wash basin and a mixing battery, small dish washer
- aspirator
- refrigerator
- integrated oven + hot plates
» Bathroom and toilet equipment:
- lavatory pan – monoblock
- wash basin and mixing battery
- bath tub and/or shower cabin
» Washing machine and water heater – in an entrance hall or a store-room
» Heating installation – outlets for wall electric heating units
» AC – split and multisplit system in drawing rooms and bedrooms
» Internal water supply and sewerage – water supply pipeline completely built under a design with polypropylene pipes, heat insulated, and sewerage – of PVC pipes
» Internal electrical wiring: internal heavy current installation, completely built under a design, with installed switches, plugs, sockets
» Controlled access to the building and the flats
» Telephone installation – cabling according to design
» Cable TV – cabling according to design
» Internet outlets – cabling according to design
» Lightning protection – according to design
» Vertical transportation – elevator equipment
» Covered parking lot for 151 cars